The purpose of the custom-designed and built, this instrument air system was built to offshore standards to withstand cyclonic conditions and comprised an integrated and…
Whilst AFH have enjoyed the opportunity to provide a range of chemical injection packages over time, it seems that each unit has a fresh set…
One AFH’s many forrays into the supply of significant engineered skid packages offshore involved the supply of two identical Sundyne pumps and associated accessories for…
A gas plant in Western Victoria required the use of a salt removal system as part of its’ Mono Ethylene Glycol (MEG) regeneration system. Revolutionary…
Victoria’s first FPSO required the fitout of an existing ship with processing equipment. This included the requirement for chemical injection packages for the metered injection…
Many gas producing fields require water removal to produce pipeline specification gas suitable for transport to further processing plants or customers. One method commonly employed…